| 2008-2009 |
|
|
Detailed technical studies - Montahut - Piquage Mounes - St Victor line |
|
|
|
France |
|
|
|
RTE - GIMR SO |
|
|
| 2008-2009 |
|
|
Detailed technical studies - Gourjade-Verfeil line |
|
|
|
France |
|
|
|
RTE - GIMR SO |
|
|
| 2008-2009 |
|
|
Mechanical strengthening - Maureix-Peyrat line |
|
|
|
France |
|
|
|
RTE - GIMR SO |
|
|
| 2008 |
|
|
Detailed technical studies - Balma-Verfeil line |
|
|
|
France |
|
|
|
RTE - GIMR SO |
|
|
| 2008-2009 |
|
|
Towers modelling - Dambron-Villejust Z les Carrés 1 & 2 line |
|
|
|
France |
|
|
|
RTE - GIMR NP |
|
|
| 2008 |
|
|
Topographical studies and towers modelling (Pls cadd data processing) - Dambron-Villejust Z Les Carrés 1 & 2 line |
|
|
|
France |
|
|
|
RTE - GIMR NP |
|
|
| 2008-2009 |
|
|
Towers modelling - Dambron-Villejust Z les Carrés 1 & 2 line |
|
|
|
France |
|
|
|
RTE - GIMR NP |
|
|
| 2008-2009 |
|
|
Strengthening studies (Pls Cadd data) - Avron-Plaisance-Villevaudé 1 et Evreux-St Pierre de Bailleul Z Croix St Leufroy lines |
|
|
|
France |
|
|
|
RTE - GIMR NP |
|
|
| 2007 |
|
|
Technical studies - optical fiber stringing studies Le Havre-Pont Sept 1 & 2 line |
|
|
|
France |
|
|
|
RTE - GIMR O |
|
|
| 2008 |
|
|
Strengthening studies - Bonneau-Valdivienne line - generic kit studies |
|
|
|
France |
|
|
|
RTE - GIMR O |
|
|
| 2008 |
|
|
Strengthening studies - Granzay-St Florent line |
|
|
|
France |
|
|
|
RTE - GIMR O |
|
|
| 2008 |
|
|
Reinforcing studies - Domloup-Z Kerlan |
|
|
|
France |
|
|
|
RTE - GIMR O |
|
|
| 2008 |
|
|
Rehabilitation studies - Cheviré-St Joseph (Loire Est) |
|
|
|
France |
|
|
|
RTE - GIMR O |
|
|
| 2007-2008 |
|
|
Reinforcing generic kit - Les Quintes-Sy Calais |
|
|
|
France |
|
|
|
RTE - GIMR O |
|
|
| 2006-2006 |
|
|
Technical studies - SM7 - Cholet-Niort |
|
|
|
France |
|
|
|
RTE - GIMR O |
|
|
| 2006 |
|
|
Preliminary design (route selection and survey work) and environnemental assessment of four 220 kV transmission lines from Hengill area - Guyed abd self supporting towers. |
|
|
|
Iceland (west) |
|
|
|
LANDSNET - Islande |
|
|
| 2005 |
|
|
Towers modelling - Line Boisse-Mions & Boisse-Génissiat |
|
|
|
France |
|
|
|
RTE - GIMR RAA |
|
|
| 2005 |
|
|
Topographical studies - Eguzon-Beauregard Line |
|
|
|
France |
|
|
|
RTE - GIMR O |
|
|
| 2005 |
|
|
Tower modelling - Albertville-Chavanod Line |
|
|
|
France |
|
|
|
RTE - GIMR RAA |
|
|
| 2005 |
|
|
Tower modelling - Givors-Mions Line |
|
|
|
France |
|
|
|
RTE - GIMR RAA |
|
|
| 2005 |
|
|
Replacing studies - tower n°54 - Cordemais-St Joseph Line |
|
|
|
France |
|
|
|
RTE - GIMR O |
|
|
| 2005 |
|
|
Pls Cadd data processing - Mitry-Mory-Villevaudé & Sausset-Villevaudé Lines - 20 km - 44 towers |
|
|
|
France |
|
|
|
RTE - GIMR NP |
|
|
| 2005 |
|
|
Tower & Pls Cadd Modelling - Q23 R2-R1-W-X levels |
|
|
|
France |
|
|
|
RTE - GIMR NP |
|
|
| 2005 |
|
|
Strengthening studies - Flers-Laval Line |
|
|
|
France |
|
|
|
RTE - GIMR O |
|
|
| 2006 |
|
|
Strengthening studies Gavrelle-Vendin 1 Line |
|
|
|
France |
|
|
|
RTE - GIMR NE |
|
|
| 2006 |
|
|
Tower modelling - Belle Epine-Rance Line |
|
|
|
France |
|
|
|
RTE - GIMR O |
|
|
| 2006 |
|
|
Pls Cadd data processing & calculation of new conductors - Fleac-Niort Line |
|
|
|
France |
|
|
|
RTE - GIMR O |
|
|
| 2006 |
|
|
Crossing mechnical studies - Givors-Mions-Vénissieux 2 Line |
|
|
|
France |
|
|
|
RTE - GIMR RAA |
|
|
| 2006 |
|
|
Optic fiber stringing studies - strengthening studies - Mézerolles-Nourottes - 26 towers |
|
|
|
France |
|
|
|
RTE - GIMR NP |
|
|
| 2006 |
|
|
Towers modelling - 225 kV Eguzon-Beauregard |
|
|
|
France |
|
|
|
RTE - GIMR O |
|
|
| 2006 |
|
|
Towers modelling - 225 kV Albertville-Chavanod line - 35?5 KM |
|
|
|
France |
|
|
|
RTE - GIMR RAA |
|
|
| 2006 |
|
|
Reinforcing kits design for TEMAC towers - 225 kV Eguzon-Beauregard line |
|
|
|
France |
|
|
|
RTE - GIMR O |
|
|
| 2004 |
|
|
Gavrelle-Vendin 1 225 kV line - Towers modelling |
|
|
|
France |
|
|
|
RTE – GIMR NE. |
|
|
| 2004 |
|
|
Reinforcing kit for N47SP_X tower - 225 kV Gros-Caillou-Trith-St Leger line |
|
|
|
France |
|
|
|
RTE – GIMR NE |
|
|
| 2003 |
|
|
Reinforcing kit for 225 kV C1SC towers |
|
|
|
France |
|
|
|
RTE - GIMRO |
|
|
| 2003 |
|
|
Porcheville-Puiseux, Cergy-Porcheville & Champagne-Plessis Gasso 225 kV lines (73 km) - 167 towers - General expertise |
|
|
|
France |
|
|
|
RTE - GIMRNP |
|
|
| 2003 |
|
|
Le Broc Carros-La Trinité Victor 225 kV line (14 km) - Strengthening studies |
|
|
|
France |
|
|
|
RTE – GIMRSE |
|
|
| 2002 |
|
|
Volvic-Ancizes 225 kV line - |
|
|
|
France |
|
|
|
RTE - GIMRRAA. |
|
|
| 2002 |
|
|
Urridafoss - Preliminary design of a 220 kV line with PLS-CADD - Environmental impact studies |
|
|
|
Iceland |
|
|
|
Landsvirkjun |
|
|
| 2001 |
|
|
Sultartangalina 4 line (200 km) - Preliminary design |
|
|
|
Iceland |
|
|
|
Landsvirkjun |
|
|
| 2001 |
|
|
Double and simple circuit line (1100 km) - Design of towers |
|
|
|
Syria |
|
|
|
Al-Jazera |
|
|
| 2001 |
|
|
Vatnsfelsslina line (5 km) - Design of 3 types of tower |
|
|
|
Iceland |
|
|
|
Donetsk Power Transmission Tower Plant |
|
|
| 2000 |
|
|
Kroflulina 3 line (120 km) - Enironmental impact studies - Topographical studies and preliminary design |
|
|
|
Iceland |
|
|
|
Landsvirkjun |
|
|
| 1999 |
|
|
Ferkessedougou – Bobo Dioulasso line(72 km) - Investigation of tower failures in 225 kV transmission line |
|
|
|
Ivory Coast |
|
|
|
Sopie |
|
|
| 1999 |
|
|
Preliminary design of towers and foundations |
|
|
|
Costa Rica |
|
|
|
Energomachexport Russie |
|
|
| 1998 |
|
|
Emergency plan and design of towers for restoration of 220 kV lines |
|
|
|
Iceland |
|
|
|
Landsvirkjun |
|
|
| 1997 |
|
|
Interconnection Tunisia-Lybia (600 km) - Preliminary design of foundations |
|
|
|
Tunisia-Lybia |
|
|
|
Transel |
|
|
| 1997 |
|
|
Spencer-Witkop line (110 km) - Preliminary design of foundations |
|
|
|
South Africa |
|
|
|
Transel |
|
|
| 1995 |
|
|
Fljotsdalslina line (120 km) - Environmental impact assessment report |
|
|
|
Iceland |
|
|
|
Landsvirkjun |
|
|
| 1995 |
|
|
Hvalfjardarjlina line - General expertise of foundations |
|
|
|
Iceland |
|
|
|
Landsvirkjun |
|
|
| 1995 |
|
|
Rod-Heroya line (22 km) - Report on condition of steel towers and foundations |
|
|
|
Norway |
|
|
|
Statnett |
|
|
| 1994 |
|
|
Wang Noi-Ranquist line - Design of long-pile foundations |
|
|
|
Thailand |
|
|
|
Betonmast |
|
|
| 1993-1994 |
|
|
Burfellslina 1 and Sogslina 3 line - Reinforcement of self-supporting towers |
|
|
|
Iceland |
|
|
|
Landsvirkjun |
|
|
| 1990-1991 |
|
|
Burfellslina 3B line (24 km) - Design of transmission line in Southwest Iceland - Suspension masts are of portal type and the tension masts are guyed columns |
|
|
|
Iceland |
|
|
|
Landsvirkjun |
|
|
|
|
 |
Headline |
|
|
HECLA confirmed as certified ISO 9001

The accredited certifier organism Bureau Veritas Certification – has certified again on November 4th, 2008 Quality Management System of HECLA being estimated and considered corresponding to the requirements of the standard NF ISO 9001 : 2000 in the field of Engineering in Electrical Power Transmission.
|
 |
More news |
|
|
03.05.2010
HECLA and Jordan Kingdom
A contract of assistance with the Electric Company of the Kingdom of Jordan, NEPCO, has just been awarded to HECLA
30.04.2010
HECLA seminar
During the last week of March, the team of HECLA met in Finnish Lapland to celebrate the ninth year of existence of the company.
18.11.2009
Hecla and Hydro 2009
HECLA participated actively in the event HYDRO 2009 which has been organized 26, 27, and October 28th, 2009 in Lyon.
|
|
|