2007-2009 Strengthening and replacing studies - Eguzon-Rueyres line (from tower n° 189 to Rueyres) France RTE - GIMR SO
2008-2009 Optical fiber stringing studies - Barnabos-Remise 1 & 2 line France RTE - GIMR NP
2008-2009 Strengthening mechanical studies - Flamanville-Menuel 4 line France RTE - GIMR NP
2008 Chambry-Mery sur Seine line - calculation of new conductors and towers & foundations reinforcing France RTE - GIMR NP
2003 Cenelec standard with regard to 400 kV and 220 kV lines Poland TRANSEL (France) - SELPOL (Pologne)
2005 Ulikiluto-Huittinen and Uviala - Preliminary design of two 400 kV transmission lines in Finland with guyed and self supporting towers Finland Technoprom - Russie
2006 Preliminary design and environmental assessment of two 400 kV transmission lines from Hengill area in West Iceland. Route selection and survey of profile. Guyed and self supporting towers. Iceland Landsnet
2002 Design of foundation for self supporting towers in southe of Finland - Expert consulting on construction work Finland Statnett Entreprenor in Norway
2002 Kymi - Vainikkala - Design of foundation for self supporting towers. Finland Statnett in Norway
2006 Technical studies ARGOEUVES-TERRIERS 1 & 2 - 30 km - 63 supports France RTE - GIMR NE
2006 Modification of temporary steel structure - 400 kV Cordemais-Distré France RTE - GIMR O
2006 Feasibility studies - 400 kV Albertville-Cornier line - 35,5 km - 73 towers France RTE - GIMR RAA
2006-2006 Strengthening studies - 400 kV Eguzon-Rueyres line - from 192 to Rueyres - 119 km - 180 towers France RTE - GIMR SO
2005 Reinforcing of towers - 2x400 kV Albertville-Grande Ile line - 40 km - 6 towers France RTE - GIMR RAA
2005 Strengthening studies - level 2 - 2x400 kV Le Havre-Rougemontier line -- 55 km France RTE - GIMR NP
2004 Topographical studies - 400 kv line Dambron-Verger - 55 km France RTE - GIMR O
2004 Strengthening studies - 2x400 kV Le Havre-Rougemontier line -- 55 km France RTE - GIMR NP
2004 Rehabilitation studies - 400 kV Eguzon -Rueyres - 114 km - 180 towers France RTE - GIMR SO
2004 Strengthening studies - 2x400 kV Albertville-Grande Ile line France RTE - GIMR RAA
2004 Generic kit design - Tower type A2TB3 & C3 France RTE – GIMR RAA.
2004 Generic kit design - Tower type A4NB3 France RTE
2004 Reinforcing kit design - Tower type B1NC - 400kV Eguzon-Marmagne line France RTE - GIMRO
2004 Temporary steel structure - Tower type A4 - 400 kV France RTE – GIMR O
2003 PLS-CADD data processing - 400 kV Méry-Vesles line (80 km) France RTE - CNER
2003 Autocad processing - Mezerolles-Porcheville 1-2 400 kV lines France RTE – GET SO
2003 Strengthering studies - Porcheville-Mézerolles 3-4 400 kV lines France RTE - GIMRNP
2003 General expertise - Eguzon-Rueyres 400 kV lines - (119 km) 180 towers France RTE – GIMRSO
2003 Technical studies - Dambron-Verger 1&2 and Eguzon-Marmagne 400 kV lines - (143 km) France RTE - GIMRO
2002 TOWER calculations - Tower type A2 France RTE - GIMRO
2001 Complete design - Kromolice-Plewiska 400/200 kV line Poland Selpol/Transel
2001 Tornio steel works - Preliminary design of towers and fondations Finland Betonmast
2000 Sultartangalina 3 in South-Iceland - Lenght of line 120 km - Complete design Iceland Landsvirkjun
1999-2000 Lansisalmi-Kymi (46 km) - Calculation of conductors and earth wires - Design of towers and foundations - Checking of profile Finland Fingrid
1999-2000 Alvesta-Hemsjö line (75km) - Design of towers and foundations Sweden Betonmast
1997 Sultartangalina line (13 km) - Design of conductors, insulators, towers and foundations Iceland Landsvirkjun
1997-1998 1997-1998 Burfellslina 3A line (96 km) - Environmental impact assessment and design of 400 kV transmission line - Suspension and light-angle structures are guyed V-mast and regular tension masts are guyed columns - Special towers and terminal towers are self-supporting towers Iceland Landsvirkjun
1998 Midskog-Stenkullen line (15 km) - Predesign of towers Sweden Statnett
1996 Ariadne-Venus line (130 km) - Preliminary design of foundations South Africa Transel
1995 Breared-Söderasen line (75 km) - Predesign of double circuit towers and foundation Sweden Statnett
1993-1994 Horred-Breared line (70 km) - Design of five type of special towers including all workshop drawings and foundations drawings Sweden Statnett
Headline
HECLA confirmed as certified ISO 9001
The accredited certifier organism Bureau Veritas Certification – has certified again on November 4th, 2008 Quality Management System of HECLA being estimated and considered corresponding to the requirements of the standard NF ISO 9001 : 2000 in the field of Engineering in Electrical Power Transmission.
See all the pictures of the Hecla team on Hekla on september 2006
More news
03.05.2010
HECLA and Jordan Kingdom
A contract of assistance with the Electric Company of the Kingdom of Jordan, NEPCO, has just been awarded to HECLA

30.04.2010
HECLA seminar
During the last week of March, the team of HECLA met in Finnish Lapland to celebrate the ninth year of existence of the company.

18.11.2009
Hecla and Hydro 2009
HECLA participated actively in the event HYDRO 2009 which has been organized 26, 27, and October 28th, 2009 in Lyon.

Hecla 191 avenue Aristide Briand 94234 Cachan Cedex - France | tel: 00331.49.69.12.60 fax: 00331.49.69.12.61 | © 2008 Hecla - All rights reserved